Enterprise networking / SD-WAN
Enterprise networking and SD-WAN
Connect headquarters, campuses, branches, server rooms and cloud resources in one verifiable map of sites, circuits, access policy and operating ownership.
Sites / paths / policy
Map the sites before choosing the path.
Headquarters, campuses, branches and offices may use different circuits to reach data centre and cloud resources. The key questions are which path an application takes, where policy applies and who can explain the map after change.

Before a path is chosen
What still needs checking after connectivity is in place?
SD-WAN does not replace switching, routing, wireless or cabling. Applications, connectivity, security and operating conditions must be defined within one implementation scope.
From site to handover
Site inventory, implementation and handover.
Inventory sites, switching and routing foundations, wireless and cabling dependencies together with application paths and security policy. Drive pilots, cutover, validation and handover around the real environment.
Bring sites and the current state together
Review headquarters, campuses, offices, branches, server rooms and cloud resources together with switching, routing, wireless, cabling and existing links.
Organise connectivity and policy by relationship
Design the pilot around application paths, security boundaries and operations ownership, then confirm change order and rollback scope.
Leave an operating baseline behind
Validate paths and cutover with representative access, then hand over topology, configuration, tests and change records.
Start with the real network
Bring the existing network to the table.
Start with a site change, circuit adjustment, cloud-resource access need or network issue under investigation to define the networking scope and next step.